London Bridge Station – missed opportunity

I can’t express how disappointed I am that the new London Bridge station re built platforms are just as low as the previous ones. The very large gap between platforms and trains still remains on terminating platforms that are straight. Network Rail don’t even have the excuse of curved platforms on the terminating platforms.

This is so weird. It costs almost exactly the same whatever the platform height.

Campaigners have been told by Network Rail that they couldn’t get a straight answer from the Dept. of Transport to make a decision to have level platform. So they erred on caution in their opinion and replaced like with like platforms of the same low height.

Why is this so important?

Level access to trains means people in wheelchairs, with pushchairs or just a bit less able can easily use our local train services. It means staff don’t have to be assigned to placing mobile ramps and helping people get on and off trains. It also means the speed at which trains can be turned around is greater. Able bodied people can get on and off of trains much more quickly.

 

Leave a Reply

Your email address will not be published. Required fields are marked *